← Product Hub
ASY-SCP-FRONT Sub-assembly In production Make
SCP front assembly — actuator and light guide
On hand
83
physically in Hawker
Allocated
0
spoken for by the order book
On the water
0
nothing inbound
Free to sell
83
reorder point 40
Bill of materials
8 lines. Material content rolls up to $30.74, plus $7.25 of bench time.
| Ref | Component | Description | Source | Qty | Unit cost | Extended | On shelf |
|---|---|---|---|---|---|---|---|
| — | ENC-SCP-FRONT | Front plate — SCP, polycarbonate | Buy | 1 | $13.80 | $13.80 | 56 |
| — | ACT-SCP-LRG | Large tactile actuator — SCP | Buy | 1 | $5.20 | $5.20 | 658 |
| — | LGD-SCP | Light guide — SCP backlit text | Buy | 1 | $2.10 | $2.10 | 927 |
| — | GRD-LIFT | Lift-up activation guard, clear | Buy | 1 | $4.60 | $4.60 | 478 |
| — | LBL-SCP | Label set — SCP, variant legend | Buy | 1 | $0.78 | $0.78 | 1,695 |
| — | SW-TAMPER | Tamper switch — SPDT lever, case and wall | Buy | 2 | $1.42 | $2.84 | 2,244 |
| — | FIX-PLATE | Fixing kit — plate screws and spacers | Buy | 1 | $1.18 | $1.18 | 1,494 |
| — | SCR-M3-8 | Screw — M3×8 pan head, black | Buy | 4 | $0.06 | $0.24 | 48,015 |
| Material content | $30.74 | 56 buildable | |||||
Enough on the shelf for 56. The binding line is ENC-SCP-FRONT.
Documents
0 held against this part — the datasheet, the install note, the drawing, the test report and the photography.
No documents held against this part yet.
Where used
The other half of the bill of materials — what this part goes into.
| Part code | Name | Kind | Ref | Qty each |
|---|---|---|---|---|
| SCP-A | Safety Call Point — Assistance | Finished | — | 1 |
| SCP-D | Safety Call Point — Duress | Finished | — | 1 |
| SCP-L | Safety Call Point — Lockdown | Finished | — | 1 |
Stock movements
Most recent 2
| When | Kind | Reference | Qty | Unit cost | Note |
|---|---|---|---|---|---|
| 3 Aug | Issue | BLD-2026-0140 | -150 | — | Issued to BLD-2026-0140 |
| 17 Aug | Adjust | OPENING | +233 | $37.99 | Opening balance carried in at changeover |
Costing
- Standard cost
- $37.99
- Last landed cost
- $37.99 0.0%
- Rolled from BOM
- $37.99
Details
- Range
- Safety Call Point
- Revision
- B
- Reorder point
- 40
- Reorder quantity
- 120
- Lead time
- 7 days
- Bench time
- 5 min each
- Origin
- AU
- Bin
- S1-10
Built on the bench at Hawker.
Revisions
Rev B Current 4 Oct
Fuse holder footprint widened.
Dan Whitlock
Rev A 15 Feb
Initial release.
Dan Whitlock
Import a bill of materials for ASY-SCP-FRONT
Paste it straight out of the spreadsheet. Tab, comma or column separated — part code, quantity, reference.
Add a bill-of-materials line
Add a document
Register the file against the part so it stops living in a folder.
Release a new revision of ASY-SCP-FRONT
Currently at rev B.
Edit ASY-SCP-FRONT