PCA-SCP Sub-assembly In production Buy

SCP control board, populated

On hand
26
physically in Hawker
Allocated
0
spoken for by the order book
On the water
800
paid for, $36,096 · first 23 Aug 2026
Free to sell
26
under the 40 reorder point, covered by the water
Bill of materials
17 lines. Material content rolls up to $23.19.
RefComponentDescriptionSource QtyUnit costExtendedOn shelf
PCB1 PCB-SCP-2L PCB — SCP control, 2 layer, 76×76 Buy 1 $3.80 $3.80 830
U1 MCU-G0 Microcontroller — STM32G031 QFN Buy 1 $3.42 $3.42 537
K1,K2 RLY-12-3A Relay — 12VDC SPDT 3A sealed · Redundant output — two relays, not one Buy 2 $2.68 $5.36 237
LS1 SNDR-85 Piezo sounder — 85dB, adjustable drive Buy 1 $2.12 $2.12 3,042
SW1-SW4 SW-TACT-6 Tactile switch — 6mm, 100,000 operations · Four switches, each independently activates Buy 4 $0.38 $1.52 4,925
D1,D2 LED-RED LED — red 0805 Buy 2 $0.12 $0.24 25,996
D3,D4 LED-AMB LED — amber 0805 Buy 2 $0.12 $0.24 18,642
D5,D6 LED-BLU LED — blue 0805 Buy 2 $0.14 $0.28 10,257
J1,J2 TB-45-3P Terminal block — 45° pluggable 3 pole Buy 2 $1.56 $3.12 4,206
U2 REG-5V Regulator — 5V LDO SOT-23 Buy 1 $0.46 $0.46 9,481
U3,U4 OPT-817 Optocoupler — 4 pin DIP Buy 2 $0.34 $0.68 4,610
D7-D14 DIO-4148 Diode — 1N4148W SOD-123 Buy 8 $0.05 $0.40 25,027
D15 DIO-SMBJ TVS diode — SMBJ24CA Buy 1 $0.28 $0.28 12,943
C1-C10 CAP-100N Capacitor — 100nF 50V 0805 Buy 10 $0.04 $0.40 30,064
C11-C13 CAP-10U Capacitor — 10µF 25V 1206 Buy 3 $0.11 $0.33 28,386
R1-R12 RES-10K Resistor — 10K 1% 0805 Buy 12 $0.03 $0.36 71,307
R13-R18 RES-1K Resistor — 1K 1% 0805 Buy 6 $0.03 $0.18 23,728
Material content $23.19 118 buildable
Enough on the shelf for 118. The binding line is RLY-12-3A.
Documents
0 held against this part — the datasheet, the install note, the drawing, the test report and the photography.
No documents held against this part yet.
Where used
The other half of the bill of materials — what this part goes into.
Part codeNameKindRefQty each
SCP-A Safety Call Point — Assistance Finished 1
SCP-D Safety Call Point — Duress Finished 1
SCP-L Safety Call Point — Lockdown Finished 1
Stock movements
Most recent 2
WhenKindReferenceQtyUnit costNote
3 Aug Issue BLD-2026-0140 -150 Issued to BLD-2026-0140
17 Aug Adjust OPENING +176 $48.60 Opening balance carried in at changeover
Costing
Standard cost
$48.60
Last landed cost
$57.35 +18.0%
Rolled from BOM
$23.19
Details
Range
Safety Call Point
Revision
B
Reorder point
40
Reorder quantity
120
Lead time
60 days
HS code
8534.00
Origin
CN
Bin
S1-02
Supplier
Novatek Electronics (Dongguan)
NVT-PCA-SCP
Populated turnkey by Novatek. The component list below is the engineering BOM the quote is built from.
On the water
800 units, $36,096, paid for or on order.
ShipmentStageQtyETA
SHP-2026-011 On the water 800 23 Aug
Revisions
Rev B Current 10 Oct
Initial release.
Ken Mckeon
Rev A 19 Jan
Initial release.