Jack Fuse
Jack Fuse
Build Orders Demo 9 live · 5 short of components
17 Aug 2026

Build Orders

Final assembly, test and pack at Hawker. Running a build consumes its bill of materials off the shelf, puts the finished units on, and mints a batch number that records which shipments the components came off.

Live build orders
9
4,620 units to build
Short of components
5
cannot be kitted from the shelf today
Bench time booked
381 h
estimated across every live build
Value on the bench
$113,940
at standard cost, when finished
Drag a card between columns. Dropping one on Complete runs the build for real — components off the shelf, finished units on, batch number minted. A build that is short of a component refuses and tells you which shipment the missing parts are on.
Planned 3 $39,471
PP5FR-UNI
Power Port 5FR-UNI — versatile power distribution module
Short 111 × ENC-PP-ABS 1,800 on the water, 15 Aug
Due 1 Sep
SCP-L
Safety Call Point — Lockdown
Short 94 × PCA-SCP 800 on the water, 23 Aug
Due 24 Aug
SCP-D
Safety Call Point — Duress
Short 94 × PCA-SCP 800 on the water, 23 Aug
Due 2 Sep
Kitting 2 $32,336
LODESTAR
Lodestar — versatile alarm indicator
Short 12 × PCA-LDS
Due 25 Aug
PP8FR
Power Port 8FR — fire tripped power distribution module
Short 232 × PCA-PP8 900 on the water, 23 Aug
Due 24 Aug
On the bench 2 $28,924
FAST-R6J
FAST-R6J — Wiegand joiner
Every component covered
Due 29 Aug
EBG
Electronic Break Glass — flush mount
Every component covered
Due 31 Aug
Test & QA 2 $13,209
ADI
ADI — automatic door & gate interface
Every component covered
Due 18 Aug
ATMOD10
ATMOD 10K/10K — Red
Every component covered
Due 26 Aug
Complete 5 $87,485
SCP-A
Safety Call Point — Assistance
Batch B26-0540
Completed 3 Aug
PP8FR
Power Port 8FR — fire tripped power distribution module
Batch B26-0538
Completed 29 Jul
EBG
Electronic Break Glass — flush mount
Batch B26-0539
Completed 20 Jul
ATMOD47
ATMOD 4K7/4K7 — Yellow
Batch B26-0541
Completed 14 Jul
MINI-FRI
Mini-FRI — field relay interface
Batch B26-0542
Completed 4 Jul